Project ALDI, Inc. Food Distribution Facility – Frederick, MD

A M King provided complete Design-Build services for this new 497,000 SF greenfield food distribution facility which was completed in 2007. The total site consists of 75 acres, approximately 70 acres of which were developed and improved. Extensive site work was required, with over 100,000 cubic yards of subsurface rock requiring removal. In addition to providing complete design and engineering services, A M King also managed the state and local project approval process and provided off-site roadway and utility design and construction. A M King also provided site analysis and due diligence for the site selection process. The total construction duration from start of foundations to substantial completion was 15 months.